Business Central online receives two major updates a year, in April and October, and a minor update in every other month. Each major update can be scheduled anywhere in a five-month update period, followed by a one-month grace period and an enforced update. Microsoft has postponed the rollout of most major versions since 2020, so production should move late, after a tested sandbox copy.

The one-sentence answer

Set notification recipients, update a sandbox copy of production first, fix or pre-stage incompatible extensions, and schedule production deliberately late in the five-month update period, because Microsoft does not roll back an environment that updated before a rollout was paused.

Key Takeaways

  • Business Central online ships major updates in April and October and minor updates in every other month; each major update has a five-calendar-month update period, then a one-month grace period, then an enforced update period.
  • Microsoft documents no limit on how often you change the update date in the admin center; it limits the dates instead: any day inside the update period, and only an earlier date once the grace period starts.
  • When Microsoft postpones a rollout, environments scheduled during the pause are not updated and are retried seven days later, while environments that already updated stay on the new version.
  • Availability, postponement, compatibility and failure emails only reach the addresses on the Notification Recipients tab of the admin center, sent from no-reply-dynamics365@microsoft.com.
  • Fix an incompatible per-tenant extension in a sandbox on the new version and upload it with Deployment Schedule set to Next major; in the enforced period Microsoft can uninstall it so the update succeeds, keeping its data.
  • After a successful update there is no downgrade: a point-in-time restore (up to 28 days back) creates a separate environment, loses later transactions and cannot target a version in its grace or enforced period.

The cadence: two majors, ten minors

Business Central online has two major releases a year, in April and October. In every other month Microsoft releases a minor update containing critical improvements and regulatory changes. Both are generally available at the start of the month; existing environments see the new version offered as an update about a week later, and new environments are created on it straight away. Today that means version 29 (2026 release wave 2, released in October 2026) is rolling out, with monthly 29.x updates to follow and the next major version due in April 2027.

Each major version moves through four phases. The rules below are Microsoft’s documented ones; the example dates apply them to the current cycle.

1 →

Public preview

March / September

v29: September 2026

Sandboxes on the version marked (Preview). Deleted 30 days after GA.

2 →

Update period

5 calendar months from GA

v29: October 2026 to early March 2027

Pick any date. Unsuccessful attempts are retried seven days later.

3 →

Grace period

1 month

v29 cycle: March 2027

Dates can only move earlier. In-product warnings to users are possible.

4

Enforced update

After grace ends

v29 cycle: from April 2027

Extensions that block the update can be uninstalled. Their data is kept.

The update period ends in early March for October releases and in early September for April releases. The admin center shows the exact dates for each environment.

Since the update policy change that became generally available in April 2025, minor updates are effectively optional: you can target any later version and skip the intermediate ones, as long as that version is released inside the update period of your current major. Major versions cannot be skipped.

What you control in the admin center

Everything happens per environment, under Environments → environment name → Update Settings in the Business Central administration center.

  • Update window. The hours in which Microsoft may start an update. The default is 8:00 PM to 6:00 AM local time for the environment’s country/region; a custom window must be at least six hours. An update that has not finished when the window closes is cancelled, and the environment is restored and rescheduled seven days later.
  • Next Update. Select Modify to open Schedule Environment Update, then choose a target version marked Available and a date, or a planned version that has not shipped yet. With a planned version, Microsoft waits until it is available and then schedules the update for a date at least seven days later.
  • Allow the update to run outside the update window. Combined with today’s date, this starts the update immediately and lets a large update run beyond 24 hours. It is meant for sandboxes and controlled cutovers, not for an environment users need the next morning.
  • Apps Update Cadence. By default Marketplace apps update with major updates (or earlier if the app is required for a minor). Set With minor and major updates if you want them refreshed monthly; per-tenant extensions are not affected by this setting.

How many times can you postpone? Microsoft documents no counter. The constraint is the calendar: within the update period you can move the date to any day, as often as you like. Once the grace period starts you can only move it earlier, and once enforcement starts the update will happen. While the update runs, users and sign-ins are blocked with Service is under maintenance.

What a paused rollout actually means

Microsoft calls it a postponed update: when a critical issue is found in a version that is rolling out, further updates to that version stop. Notification recipients receive an email, the admin center shows a notice, and neither includes a resume date because Microsoft does not know it yet. Another email follows when updates resume.

Your environment when the pause is calledWhat happens
Already updated to the paused versionStays on it. Microsoft documents no rollback; you wait for the fix in a later build.
Scheduled for a date inside the pauseNot updated. Recipients are told the update did not run, and it is retried seven days later. You can pick another date or target version.
Scheduled late in the update periodUnaffected unless the pause is still active on that date, and by then the build has had weeks of exposure.

This is not rare. Yun Zhu’s postponement log records at least one pause for 11 of the 13 major versions from 16.0 to 28.0, plus several minors. Version 28.0 was postponed three times: in mid-April, in early May and again from late June until mid-July 2026. Steven Renders draws the practical conclusion: environments scheduled at the start of the window are, in effect, the early adopters.

Do not count on a deadline extension

Earlier versions of Microsoft’s documentation said the last available date was prolonged by the length of the pause, and partner blogs still describe it that way. The current text on Microsoft Learn no longer promises it. Plan as if the end of the update period is fixed.

Notifications: the step most tenants skip

Every warning above is sent by email only to the addresses on the Notification Recipients tab of the admin center. If nobody is listed, nobody is told: not about availability, scheduling, success or failure, a postponement, or a per-tenant extension that is incompatible with the next version. Add at least the internal administrator and your partner’s support address (up to 100 recipients; use a distribution list for more), and allow no-reply-dynamics365@microsoft.com through spam filtering.

Two other channels are worth wiring in. Microsoft is moving these events to Microsoft 365 Message Center and says the emails will eventually be a subset of it. If the environment sends telemetry to Application Insights, an available update emits a signal tagged LC0100, which you can turn into a Teams alert. One gap: updates to preview versions never generate emails; check the Operations page instead.

When a per-tenant extension blocks the update

Before each major update Microsoft checks the per-tenant extensions in every environment for compatibility with the next version and emails recipients about detected issues. That check is technical only; functional behaviour remains your responsibility. If the update still fails, the environment is restored to its original version so users can work, and the attempt is rescheduled seven days later.

  1. Fix the code in Visual Studio Code against the new version.
  2. Test it in a sandbox running the new major, either preview or released.
  3. Upload it under Manage Apps → Install Extension with Deployment schedule set to Next major, so the compatible version installs as part of the environment update.
  4. Change the update date to today to retry, rather than waiting for the automatic seven-day retry.

If nothing is done, Microsoft’s documented escalation is roughly ten weeks of emails, six weeks of in-product notices asking users to contact their administrator, and a month of more explicit warnings. In the enforced update period, extensions that cause the update to fail can be uninstalled. Their data stays in the database and returns when a compatible version is installed, but the functionality is gone until then.

Marketplace (AppSource) apps follow the publisher’s cycle. Their incompatibilities might not be visible in your admin center, and an app incompatible with the latest release might be removed from Marketplace 30 days after that release. Ask each publisher for a compatible version before you schedule production.

Rollback: what you can and cannot undo

  • Running update: you can cancel it from Operation Details, and the environment returns to its pre-update state. Not possible in the enforced period.
  • Failed or cancelled update: restored to the original version automatically.
  • Successful update: no downgrade. A point-in-time restore (up to 28 days back, up to 10 times per calendar month, requires the D365 BACKUP/RESTORE permission set) creates a new environment on the version of that moment, without anything posted since. It is not possible to a version in its grace or enforced period.

In practice, once production has updated and users have posted, the realistic path is forward: a fix from Microsoft or from the extension owner. That is the strongest argument for testing before the date rather than after.

Readiness checklist for each major update

  1. Recipients: verify notification recipients and the spam rule for every tenant you manage.
  2. Update windows: check each environment’s time zone and window against night-time job queues and integrations.
  3. Preview: in March or September, create a preview sandbox or update an existing sandbox, install your extensions and check what changed (Microsoft Learn’s What’s new or changed and the AI at Work roadmap).
  4. Production copy: once the version is available, copy production to a sandbox and update it immediately (today’s date plus the outside-window option).
  5. Extensions: resolve every compatibility email, stage fixed PTEs with Next major, and confirm compatible versions of every Marketplace app.
  6. Regression tests: replay your key processes (order to cash, purchase to pay, month-end, VAT, payment export) with the page scripting tool, which needs the PAGESCRIPTING - REC and PAGESCRIPTING - PLAY permission sets. Developers can run AL tests too; see running AL tests from VS Code.
  7. Schedule production late: pick a date several weeks into the update period, after the sandbox passed and after the rollout has run without a pause, and well before the grace period.
  8. Communicate: tell users the date, the maintenance message they will see and who to call the morning after; pause critical integrations if needed.
  9. Watch: during the window, follow postponement emails and the admin center notice; afterwards, check the Operations page and the key processes.

What a good update weekend looks like

The aim is not to avoid every pause, which is outside your control. It is to make sure that when Microsoft calls one, your production environment is still on the previous version, already tested against the next one, and scheduled for a date you chose. Our Business Central support team runs this cycle for customer tenants every April and October.

SK
About the Author
Sébastien Konsbruck
SK Consulting S.A.
LinkedIn

Want the next major update planned, not suffered?

We set up notifications, test a production copy on the new version, check your extensions and apps, and schedule production on a date that suits your business.